Restoration Plans
Final Phase 2 Restoration Plan and Environmental Assessment #7.1: Terrebonne HNC Island Restoration Project
The Deepwater Horizon Louisiana Trustee Implementation Group has released the Final Restoration Plan and Environmental Assessment #7.1 approving the Terrebonne HNC Island Restoration project to restore birds injured by the Deepwater Horizon oil spill. The plan, Final Phase 2 Restoration Plan and Environmental Assessment #7.1: Terrebonne HNC Island Restoration Project (PDF, 96 pages), is a continuation of Restoration Plan/Environmental Assessment #7: Wetlands, Coastal, and Nearshore Habitats, and Birds. That plan selected the Terrebonne HNC Island Restoration Project for engineering and design (Phase 1) funding under the Birds Restoration Type. This Final Phase 2 Plan evaluated a reasonable range of design alternatives and selects
Louisiana Trustees Release Final Mid-Barataria Sediment Diversion Restoration Plan
The Louisiana Trustee Implementation Group, the agencies charged with restoring Louisiana’s natural resources after the Deepwater Horizon oil spill, has released the Mid-Barataria Sediment Diversion Final Restoration Plan. The plan evaluates using a large-scale sediment diversion to reconnect the Mississippi River to Louisiana's Barataria Basin estuary to restore wetlands and contribute to the broader restoration of its ecosystem. If it is ultimately permitted and funded, this first-of-its-kind project, estimated to cost more than $2 billion, represents one of the largest and most innovative coastal habitat restoration efforts ever undertaken. The Final Restoration Plan provides an in-depth analysis of the benefits and impacts
Draft Phase 2 Restoration Plan and Environmental Assessment #7.1: Terrebonne HNC Island Restoration Project
The Deepwater Horizon Louisiana Trustee Implementation Group is proposing the Terrebonne Houma Navigation Canal (HNC) Island Restoration project to restore birds injured by the Deepwater Horizon oil spill. The project is included in a draft restoration plan, which is now open for public comment through September 26, 2022. The Trustees will hold a public webinar on the plan on September 8 at 2:00 p.m. CT, followed by the Louisiana Trustees’ Annual Public Meeting at 2:30 p.m. CT. The plan, Draft Phase 2 Restoration Plan/Environmental Assessment #7.1: Terrebonne HNC Island Restoration Project, is a continuation of Restoration Plan/Environmental Assessment #7: Wetlands, Coastal, and Nearshore Habitats,
Register Today: Louisiana Trustee Implementation Group Public Annual Meeting Webinar September 8
The Deepwater Horizon Louisiana Trustee Implementation Group will hold its annual public meeting on September 8, 2022 at 2:30 p.m. CT via webinar, immediately following the Louisiana Draft 7.1 Restoration Plan presentation, which will begin at 2:00 p.m. CT. Both public engagement opportunities can be accessed via the same registration link below. During the annual meeting, we will present updates on the progress made in the last year by the Louisiana Trustee Implementation Group. After the webinar presentations, attendees will have an opportunity to ask questions and provide comments to the Trustees. Date and Time: September 8, 2022 at 2:30 p.m. CT Register: https://attendee.gotowebinar.com/register/1617789947761424400 After registering, you will receive a
Final Restoration Plan and Environmental Assessment #8: Restoration of Wetlands, Coastal, and Nearshore Habitats
Final Restoration Plan and Environmental Assessment #8: Restoration of Wetlands, Coastal, and Nearshore Habitats The Louisiana Trustee Implementation Group has released its latest plan to restore wetlands, coastal, and nearshore habitats to address injuries caused by the Deepwater Horizon oil spill. The plan, Final Restoration Plan/Environmental Assessment #8: Restoration of Wetlands, Coastal, and Nearshore Habitats, selects four projects for implementation with an estimated total cost of almost $75 million: Two projects are selected for engineering and design: New Orleans East Landbridge Restoration will provide engineering and design for a project intended to create and restore marsh habitat that separates Lake Pontchartrain from Lake Borgne and the Gulf
Presentation for Draft Restoration Plan and Environmental Assessment #8: Wetlands, Coastal, and Nearshore Habitats and the proposed preferred alternatives
Presentation for Draft Restoration Plan and Environmental Assessment #8: Wetlands, Coastal, and Nearshore Habitats and the proposed preferred alternatives The Louisiana Trustee Implementation Group (LA TIG) released its Draft Restoration Plan and Environmental Assessment #8: Wetland, Coastal, and Near shore Habitats on March 18, 2022. The LA TIG accepted public comments through April 18, 2022. A public webinar was held on April 5, 2022 at 12:00 pm CT to present the draft restoration plan and the proposed preferred alternatives. The presentation slides and script from the meeting are available below. RP8 Public Meeting Presentation Final LA RP8 Public Meeting
Draft Restoration Plan and Environmental Assessment #8: Wetlands, Coastal, and Nearshore Habitats
Draft Restoration Plan and Environmental Assessment #8: Wetlands, Coastal, and Nearshore Habitats The Louisiana Trustee Implementation Group has released its Draft Restoration Plan and Environmental Assessment #8: Wetlands, Coastal, and Nearshore Habitats. We will accept comments through April 18, 2022. The draft plan includes projects that restore Wetlands, Coastal, and Nearshore Habitats restoration type. It includes four proposed preferred alternatives. Two of the preferred alternatives are conceptual projects that would undergo engineering and design (E&D) if selected, and two alternatives that would be analyzed for full implementation if selected. The four proposed preferred alternatives have a total estimated cost
Louisiana Trustees Seek Comments on Proposed Mid-Barataria Sediment Diversion
The Louisiana Trustee Implementation Group is seeking public input on a draft restoration plan proposing an investment of up to $2 billion in the Mid-Barataria Sediment Diversion project. If approved, the large-scale project would reconnect the Mississippi River to Louisiana’s Barataria Basin. The project will allow the controlled release of freshwater, nutrients and sediment back into the basin to rebuild wetlands and contribute to the broader restoration of its ecosystem. The Draft Phase II Restoration Plan #3.2 is available for public comment for 60 days through May 4, 2021, with virtual public meetings to present the draft plan and
Final Restoration Plan and Environmental Assessment #7: Wetlands, Coastal, and Nearshore Habitats, and Birds
The Louisiana Trustee Implementation Group has released its Final Restoration Plan and Environmental Assessment #7: Wetlands, Coastal, and Nearshore Habitats, and Birds. We accepted comment from August 20, 2020 through September 22, 2020 and held a public meeting on September 2, 2020. The plan includes projects that restore the Wetlands, Coastal, and Nearshore Habitats and Birds restoration types. It includes five projects which have a total estimated cost of $234.6 million. The selected alternatives are: Wetlands, Coastal, and Nearshore Habitat: Grande Cheniere Ridge Marsh Creation – This project will create up to 624 acres of marsh near Bayou Grande Cheniere
The Louisiana Trustee Implementation Group has approved the Final Phase 2 Restoration Plan/Environmental Assessment #1.2: Spanish Pass Ridge and Marsh Creation Project and Lake Borgne Marsh Creation Project.
The Louisiana Trustee Implementation Group has approved the Final Phase 2 Restoration Plan/Environmental Assessment #1.2: Spanish Pass Ridge and Marsh Creation Project and Lake Borgne Marsh Creation Project. We released the draft restoration plan in October 2019 and accepted public comment through November 20, 2019. This final plan includes construction activities for the restoration of wetlands, coastal, and nearshore habitats injured in the Louisiana Restoration Area as a result of the Deepwater Horizon oil spill. The plan analyzes restoration project design alternatives for two projects that are components of larger marsh restoration strategies, and were approved for engineering and design
Draft Restoration Plan and Environmental Assessment #7: Wetlands, Coastal, and Nearshore Habitats, and Birds Released
The Louisiana Trustee Implementation Group has released its Draft Restoration Plan and Environmental Assessment #7: Wetlands, Coastal, and Nearshore Habitats, and Birds. We will accept comments through September 22, 2020. The draft plan includes proposed projects that restore the Wetlands, Coastal and Nearshore Habitat and Birds restoration types. It includes five proposed preferred alternatives which have a total estimated cost of $234.1 million. The proposed preferred alternatives are: Birds: Isle au Pitre Restoration – This project would enhance nesting conditions on the existing island by elevating portions of the island with dredged sediment and planting suitable vegetation for nesting brown
The Louisiana Trustee Implementation Group has approved the Final Restoration Plan/Environmental Assessment #5: Living Coastal and Marine Resources – Marine Mammals and Oysters.
The Louisiana Trustee Implementation Group has approved the Final Restoration Plan/Environmental Assessment #5: Living Coastal and Marine Resources – Marine Mammals and Oysters. We released the draft restoration plan in March 2020 and accepted public comment through April 20, 2020. This final plan will replenish and protect living coastal and marine resources (specifically, oysters and marine mammals) in the Louisiana Restoration Area. One project approved in the plan will focus on increasing capacity to respond to marine mammal strandings, and the other three will focus on oyster restoration in the Louisiana Restoration Area. We released the draft restoration plan in