The Louisiana Trustee Implementation Group has released the Louisiana Trustee Implementation Group Draft Restoration Plan/Environmental Assessment #1.2: Barataria Basin Ridge and Marsh Creation Project Spanish Pass Increment and Lake Borgne Marsh Creation Project Increment One (Phase 2 RP/EA #1.2), proposing construction activities for the restoration of wetlands, coastal, and nearshore habitats injured as a result of the Deepwater Horizon (DWH) oil spill. The two projects were approved for engineering and design (E&D) in a 2017 restoration plan entitled Louisiana Trustee Implementation Group Final Restoration Plan #1: Restoration of Wetlands, Coastal, and Nearshore Habitats; Habitat Projects on Federally Managed Lands; and Birds (Phase 1 RP #1). The Phase 2 RP/EA #1.2 analyzes design alternatives for the two projects and proposes a preferred design alternative for construction of each. We invite comments on the draft Phase 2 RP/EA #1.2.
The LA TIG will host a public webinar on October 28, 2019, at 4:00 p.m. CST. The public may register for the webinar at https://attendee.gotowebinar.com/register/4633351197181038605.
After registering, participants will receive a confirmation email with instructions for joining the webinar. The presentation will be posted on the web shortly after the webinar is conducted.
You may submit comments on the draft Phase 2 RP/EA #1.2 by one of the following methods:
- Via the Web: http://parkplanning.nps.gov/LATIGPhase2-1-2
- Via U.S. Mail: U.S. Fish and Wildlife Service, P.O. Box 29649, Atlanta, GA 30345. To be considered, mailed comments must be postmarked on or before the comment deadline.
- During the public webinar: Written comments may be provided during the webinar.
We will consider public comments on the draft Phase 2 RP/EA #1.2 received on or before November 18, 2019. After the public comment period ends, the LA TIG will review, consider, and address public comments before releasing a final plan and environmental assessment.